FINVECTOR · EVIDENCE TIMELINE · NOTE 24

A forecast card needs a data-lineage trail

The National Weather Service linked-data workflow is translated into a four-step lineage from coordinates to office, grid, hourly forecast, and alerts.

REPRODUCIBLE WORK

Follow the evidence in the order it becomes usable.

01

Resolve point

/points/{latitude},{longitude}

Issuing office, grid coordinates, zones, and linked endpoints
02

Follow hourly link

forecastHourly property

Seven-day hourly forecast endpoint
03

Check alerts

/alerts/active with the relevant area or zone

Separate hazard evidence
04

Refresh lineage

Recheck /points periodically

Avoid stale office/grid mapping

SOURCE SNAPSHOT

Anchor the evidence to its source and time.

INPUT AND EVIDENCE LEDGER

Keep the snapshot attached to its origin.

FieldValueOrigin
Starting inputLatitude and longitudeUser or water geometry
Grid resolutionAbout 2.5 km × 2.5 kmNWS documentation
Hourly horizonNext seven daysNWS documentation
Grid stabilityOffice/grid mapping can occasionally changeNWS documentation

DECISION READING

What survives the timeline check.

Caching the forecast without its point-to-grid lineage can attach weather to the wrong place after a mapping change. FINVECTOR should retain coordinates, office, grid X/Y, generated time, forecast update time, and alert query separately.

SENSITIVITY

Where the chain can go stale.

  • A water spanning several grid cells can need more than one point.
  • Coastal marine locations may require raw grid data.
  • Forecast age and active alerts should affect trip screening differently.

BOUNDARIES

Do not extend the timestamp into a promise.

  • A 2.5 km grid does not reproduce conditions at every access point.
  • Forecasts and alerts update after the cited documentation review.
  • Weather data does not establish safe access or water conditions.

HUMAN ACCOUNTABILITY + AI USE RECORD

The owner is accountable; the technical checks were AI-assisted.

The TOOOLBOX site owner authorized the publication scope and remains the correction contact. AI assistance was used for drafting, implementation, arithmetic recomputation, and source-link checks. This record does not claim line-by-line human fact-checking or licensed professional review.

Record ID
TB-FINVECTOR-24-20260902
Owner role
TOOOLBOX site owner and developer
Technical check date
2026-09-02
Human fact-check
No separate human fact-check recorded
AI use
Drafting, code, arithmetic, and link checks
Correction channel
Public contact page
  1. Matched every endpoint role to the NWS linked-data instructions.
  2. Separated forecast lineage from the active-alert request.
  3. Added a refresh requirement for office/grid mappings that can change.

MORE FINVECTOR DECISION NOTES

Test the result yourself.

This note preserves a dated calculation. Change the inputs in the live workspace, or compare another evidence pattern below. Live source availability and results can differ from the dated example.